Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | TANGREN |
Model Number : | DX |
Certification : | ISO,SGS |
Supply Ability : | 10 lines per month |
Delivery Time : | 30 working days |
Green beans canned processing production line Canned Vegetable Production Line
Discription:
Green beans canned food production line process
Cleaning - tank dipping Preservation → go head and tail → grading →
rinse → pre-cook → cooling and rinsing → manual finishing → cans →
juice → seal → check → sterilization and cooling → storage → test →
labeling → Coding → test → packing → storage
Green beans canned main production line equipment:
Green beans canned main production line equipment are: green beans
washing machine, green beans go head to tail machine, green beans
classification machine, bubble rinsing machine, bucket-type
pre-brewing machine, cooling tank, pick the conveyor belt , Canning
hoist, green bean paste canning machine, liquid filling machine,
the main common equipment are: cans washing machine, sugar pot,
storage pot, milk pump, dual filters, Penma conveyor belt, Sealing
machine (purchased), high-pressure sterilization pot (purchased),
washing machine, labeling machine, connecting with conveyor belts.
Made of stainless steel, polished finish is beautiful and generous.
My company can provide 2 to 3 tons / hour, 3 to 4 tons / hour, 4 to
5 tons / hour three capacity specifications green beans canned
production line equipment for customer choice.
Q&A
Q1: How to visit our Factory? (not a trade company)
A: Shanghai Airport→Pick you up
Q2: How does your factory do the quality control?
A: “QUALITY FIRST " We purchase qualified parts, test the machine every step when manufacturing. We have SGS certification and ISO certification.
Q3: How about the installation?
A: Option 1, our engineer install the machines for you, also train your staff until they can run the machine independently.
Option 2, you learn this in our factory.
Q4:Do you have after-sale service?
A: 1 Year Warranty and timeless maintenance service.
Q5: How about the payment term?
A: Payment term:1, T/T 30% , 70% before shipping.
![]() |